Mohamed Badawy Abd El-Megeed Badawy
Mohamed Badawy Abd El-Megeed Badawy
Associate Professor at Structural Engineering
Career Information
Academic Information
Brief
Dr. Mohamed Badawy finished his B.Sc. in the Civil Engineering Department at Cairo University, Cairo, Egypt, in 1995. He finished his M.Sc. in the civil engineering department at Ain Shams University, Cairo, Egypt, in 2005. He received his Ph.D. in the civil engineering department at Ain Shams University, Cairo, Egypt, in 2010. He is currently a professor at Ain Shams University in the field of Construction Engineering and Project Management. He has participated in 41 published papers until 2025.
Awards
None
Books
None
Articles
Ahmed Mohammed Abdelalim, Y. Shalaby, G. A. Ebrahim, and Mohamed Badawy. 2024. “An Article Review on Vision-Based Defect Detection Technologies for Reinforced Concrete Bridges.” Ann. Civ. Eng. Manag., 1 (1): 1–17.
Altanany, M. Y., M. Badawy, G. A. Ebrahim, and A. Ehab. 2024. “Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II).” Autom. Constr., 165: 105567. Elsevier. https://doi.org/10.1016/J.AUTCON.2024.105567.
Badawy, M. 2020. “A hybrid approach for a cost estimate of residential buildings in Egypt at the early stage.” Asian J. Civ. Eng., 21 (5): 763–774. Springer. https://doi.org/10.1007/s42107-020-00237-z.
Badawy, M. 2022. “Second-order confirmatory factor analysis model for estimating the overall risk of change orders in road projects.” J. Eng. Des. Technol., 20 (5): 1217–1235. Emerald Publishing Limited. https://doi.org/10.1108/JEDT-09-2020-0383.
Badawy, M., F. K. Alqahtani, and M. Sherif. 2022. “A Multilayer Perception for Estimating the Overall Risk of Residential Projects in the Conceptual Stage.” Buildings, 12 (4). https://doi.org/10.3390/buildings12040480.
Badawy, M., F. K. Alqahtani, and M. A. Sherif. 2023. “Impact of the COVID-19 pandemic on risk factors in residential projects.” J. Asian Archit. Build. Eng., 22 (3): 1637–1647. Taylor & Francis. https://doi.org/10.1080/13467581.2022.2097239.
Badawy, M., O. Elnawawy, and E. Mohamed. 2020. “The Cost of Late Payments in Residential buildings in Arabian Countries.” Int. J. Sci. Eng. Res., 11 (3).
Badawy, M., A. Hussein, S. M. Elseufy, and K. Alnaas. 2021. “How to predict the rebar labours’ production rate by using ANN model?” Int. J. Constr. Manag., 21 (4): 427–438. https://doi.org/10.1080/15623599.2018.1553573.
Badawy, M., B. Samir, and A. Hussien. 2014. “Critical Factors Affecting Cost Variation in Residential Construction Projects in Egypt.” 1st Int. Conf. Innov. Build. Mater. EG.
Badawy, M., E. Soliman, and R. Badr. 2018. “A Model to Measure the Risk after Applying BIM on Steel Projects.” Sch. J. Eng. Technol., 6 (2): 75–82. https://doi.org/10.21276/sjet.2018.6.2.6.
Badra, I., M. Badawy, and M. Attabi. 2020. “Conceptual Cost Estimate of Buildings Using Regression Analysis In Egypt.” IOSR J. Mech. Civ. Eng. e-ISSN, 17 (5): 29–35. https://doi.org/10.9790/1684-1705012935.
Balbaa, A., O. El-Nawawy, K. El-Dash, and M. Badawy. 2019. “Risk assessment for causes of variation orders for residential projects.” J. Eng. Appl. Sci., 14 (3): 701–708. https://doi.org/10.3923/jeasci.2019.701.708.
El-Habashy, S., F. K. Alqahtani, M. Mekawy, M. Sherif, and M. Badawy. 2023. “Identification of 4D-BIM Barriers in Offshore Construction Projects Using Fuzzy Structural Equation Modeling.” Buildings, 13 (6): 1512. Multidisciplinary Digital Publishing Institute. https://doi.org/10.3390/buildings13061512.
Elsebaei, M. A., O. Elnawawy, A. A. E. Othman, and M. Badawy. 2021. “A framework to activate the health and safety regulations in the Egyptian construction industry.” J. Eng. Des. Technol., 19 (5): 1158–1191. Emerald Publishing Limited. https://doi.org/10.1108/JEDT-05-2020-0194.
Elsebaei, M., O. Elnawawy, A. A. E. Othman, and M. Badawy. 2022. “Causes and impacts of site accidents in the Egyptian construction industry.” Int. J. Constr. Manag., 22 (14): 2659–2670. https://doi.org/10.1080/15623599.2020.1819523.
Elsebaei, M., O. Elnawawy, A. Othman, and M. Badawy. 2020. “Elements of Safety Management System in the Construction Industry and Measuring Safety Performance – A Brief.” IOP Conf. Ser. Mater. Sci. Eng., 974 (1): 012013. https://doi.org/10.1088/1757-899X/974/1/012013.
Elseufy, S. M., A. Hussein, and M. Badawy. 2022. “A hybrid SEM-ANN model for predicting overall rework impact on the performance of bridge construction projects.” Structures, 46: 713–724. Elsevier. https://doi.org/10.1016/j.istruc.2022.10.100.
Elseufy, S. M., A. Hussein, and M. Badawy. 2024. “Harnessing machine learning and structural equation modelling to quantify the cost impact of rework in bridge projects.” Asian J. Civ. Eng., 25 (5): 3929–3941. Springer. https://doi.org/10.1007/s42107-024-01021-z.
Elseufy, S. M., A. Hussein, M. Badawy, and K. Alnaas. 2019. “Factors Affecting the Productivity of Reinforcement Work Labors in Low-Cost Residential Buildings.” Malaysian Constr. Res. J., 29 (3): 49–63.
Essam, O., K. Hamdy, and M. Badawy. 2024. “SIMULATING LABOR PRODUCTIVITY IN A WASTE WATER TREATMENT PLANT USING SYSTEM DYNAMIC MODELING.” J. Al-Azhar Univ. Eng. Sect., 19 (73): 1320–1348. https://doi.org/10.21608/auej.2024.312595.1700.
Fergany, M., O. El-Nawawy, and M. Badawy. 2020. “Estimation of the Overall risk in Residential Building in Egypt.” Int. J. Sci. Eng. Res., 11 (1).
Ibrahim, A., K. Hamdy, and M. Badawy. 2023. “Overall Barriers to The Prefabricated Construction Industry: A Fuzzy-SEM.” Prepr. Res. https://doi.org/10.21203/RS.3.RS-3487126/V1.
Khalil, A. H. H., M. Badawy, and A. Elmegeed. 2015. “Causes and Solutions for Loss and Bankruptcy for Contracting Companies in Egypt.” Al_Azhar Univ., (May). https://doi.org/https://www.researchgate.net/profile/Mohamed_Badawy21/publication/303590400_Causes_of_Loss_and_Bankruptcy_for_Contracting_Companies_in_Egypt.
Mohamed, S. M., A. H. Khalil, and M. Badawy. 2017. “Factors Influencing the Markup Ratio in the Construction Industry.” Int. J. Innov. Res. Sci., 6 (12): 22889–22901. https://doi.org/10.15680/IJIRSET.2018.0701008.
Osama, M., A. Sherif, and M. Badawy. 2023. “Risk analysis of construction of administration projects using Bayesian networks.” J. Eng. Des. Technol., 21 (1): 281–298. Emerald Publishing Limited. https://doi.org/10.1108/JEDT-04-2021-0222.
Taha, G., O. El-Nawawy, and M. Badawy. 2016. “A Model for Evaluation of Delays in Construction Projects.” Int. J. Innov. Res. Sci. Eng. Technol., 5 (3): 3021–3028. https://doi.org/10.15680/IJIRSET.2016.0503048.
Taha, G., A. Sherif, and M. Badawy. 2022a. “Overall Cost Overrun Estimate in Residential Projects: A Hybrid Dynamics Approach.” Appl. Comput. Intell. Soft Comput., (S. El Kafhali, ed.), 2022: 1–17. https://doi.org/10.1155/2022/2285971.
Taha, G., A. Sherif, and M. Badawy. 2022b. “Dynamic Modeling for Analyzing Cost Overrun Risks in Residential Projects.” ASCE-ASME J. Risk Uncertain. Eng. Syst. Part A Civ. Eng., 8 (3): 04022041. American Society of Civil Engineers. https://doi.org/10.1061/AJRUA6.0001262.
Toma, H. M., S. El-Sayed, A. H. Ibrahim, and M. Badawy. 2025. “Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts.” Int. J. Constr. Manag., 25 (7): 750–759. Taylor & Francis. https://doi.org/10.1080/15623599.2024.2358584.
Publications
- Badawy, M., " A hybrid approach for a cost estimate of residential buildings in Egypt at the early stage ", Asian Journal of Civil Engineering, 2020
- , " FACTORS AFFECTING THE PRODUCTIVITY OF REINFORCEMENT WORK LABOURS IN LOW-COST RESIDENTIAL BUILDINGS ", Malaysian Construction Research Journal, 2019
- Elsebaei, M.A., Elnawawy, O., Othman, A.A.E., Badawy, M., " A framework to activate the health and safety regulations in the Egyptian construction industry ", Journal of Engineering, Design and Technology, 2020
- Elsebaei, M., Elnawawy, O., Othman, A.A.E., Badawy, M., " Causes and impacts of site accidents in the Egyptian construction industry ", International Journal of Construction Management, 2020
- , " How to predict the rebar labours’ production rate by using ANN model? ", International Journal of Construction Management, 2018
- Badawy, M., " Second-order confirmatory factor analysis model for estimating the overall risk of change orders in road projects ", Journal of Engineering, Design and Technology, 2021
- Balbaa, A.A.K., El-Nawawy, O.A.M., El-Dash, K.M., Badawy, M.B.A.E.-M., " Risk Assessment for Causes of Variation Orders for Residential Projects ", Journal of Engineering and Applied Sciences, 2019
- Sherif El-Habashy, Fahad Alqahtani, Mohamed Mekawy, Mohamed Sherif, Mohamed, " Identification of 4D-BIM Barriers in Offshore Construction Projects Using Fuzzy Structural Equation Modeling ", Buildings, 2023
- Ahmed¹ M, Badawy² M, Attia³ T, Zahir⁴ A, " Causes of Claims in Building Construction Projects ", , 2022
- Mohamed, " Overall Cost Overrun Estimate in Residential Projects: A Hybrid Dynamics Approach ", Applied Computational Intelligence and Soft Computing, 2022
- Ghada Taha, Ali Sherif, Mohamed Badawy, " Dynamic Modeling for Analyzing Cost Overrun Risks in Residential Projects ", ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 2022
- Mohamed Badawy, Fahad K. Alqahtani, Mohamed A. Sherif, " Impact of the COVID-19 pandemic on risk factors in residential projects ", Journal of Asian Architecture and Building Engineering, 2022
- Mohamed, Fahad Alqahtani, Mohamed Sherif, " A Multilayer Perception for Estimating the Overall Risk of Residential Projects in the Conceptual Stage ", Buildings, 2022
- Elseufy, Sara M., Hussein, Ayman, Badawy, Mohamed, " A hybrid SEM-ANN model for predicting overall rework impact on the performance of bridge construction projects ", Structures, 2022
- Badawy, M., Alqahtani, F., Hafez, H., " Identifying the risk factors affecting the overall cost risk in residential projects at the early stage ", Ain Shams Engineering Journal, 2022
- Badawy, M., Hussein, A., Elseufy, S.M., Alnaas, K., " How to predict the rebar labours’ production rate by using ANN model? ", International Journal of Construction Management, 2021
- Osama, M., Sherif, A., Badawy, M., " Risk analysis of construction of administration projects using Bayesian networks ", Journal of Engineering, Design and Technology, 2021
- , " Conceptual Cost Estimate of Buildings Using Regression Analysis In Egypt ", Journal of Mechanical and Civil Engineering, 2020
- , " The Cost of Late Payments in Residential buildings in Arabian Countries ", International Journal of Scientific & Engineering Research, 2020
- , " Estimation of the Overall risk in Residential Building in Egypt ", International Journal of Scientific & Engineering Research, 2020
- Elsebaei, M., Elnawawy, O., Othman, A., Badawy, M., " Elements of safety management system in the construction industry and measuring safety performance – A brief ", IOP Conference Series: Materials Science and Engineering, 2020
- , " Risk assessment Model for Residential Construction Projects ", Al Azhar University Civil Engineering Research Magazine (CERM), 2019
- Elseufy, S.M., Hussein, A., Badawy, M., Alnaas, K., " FACTORS AFFECTING THE PRODUCTIVITY OF REINFORCEMENT WORK LABOURS IN LOW-COST RESIDENTIAL BUILDINGS ", Malaysian Construction Research Journal, 2019
- , " Modelling Risks of Road Construction in Real Estate Projects ", International Research Journal of Engineering and Technology (2395-0056), 2018
- Mohamed Badawy, " A Model to Measure the Risk after Applying BIM on Steel Projects ", Scholars Journal of Engineering and Technology (SJET), 2018
- , " Factors Influencing the Markup Ratio in the Construction Industry ", International Journal of Innovative Research in Science, Engineering and Technology, 2017
- , " A Model for Evaluation of Delays in Construction Projects ", International Journal of Innovative Research in Science, Engineering and Technology, 2016
- , " Developing Methodology for Stakeholder Management to Achieve Project Success ", International Journal of Innovative Research in Science, Engineering and Technology, 2015
- , " CRITICAL FACTORS AFFECTING COST VARIATION IN RESIDENTIAL CONSTRUCTION PROJECTS IN EGYPT ", 1st International Conference on Innovative Building Materials, 2014
- M. Yasser Altanany, Mohamed Badawy, Gamal A. Ebrahim, A. Ehab, " Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II) ", Automation in Construction, 2024
- Hossam M. Toma, Shimaa El-Sayed, Ahmed H. Ibrahim, Mohamed Badawy, " Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts ", International Journal of Construction Management, 2024
- Sara M. Elseufy, Ayman Hussein, Mohamed Badawy, " Harnessing machine learning and structural equation modelling to quantify the cost impact of rework in bridge projects ", Asian Journal of Civil Engineering, 2024
- Ahmed Mohammed Abdelalim,Yasmin Shalaby,Mohamed Badawy,Gamal A Ebrahim, " An Article Review on Vision-Based Defect Detection Technologies for Reinforced Concrete Bridges ", Annals of Civil Engineering and Management, 2024
- Omar Essam, Khaled Hamdy, Mohamed Badawy, " SIMULATING LABOR PRODUCTIVITY IN A WASTE WATER TREATMENT PLANT USING SYSTEM DYNAMIC MODELING ", Journal of Al-Azhar University Engineering Sector, 2024
- Yasmin M. Shalaby , Mohamed Badawy, Gamal A. Ebrahim, Ahmed Mohammed Abdelalim, " Condition assessment of concrete structures using automated crack detection method for different concrete surface types based on image processing ", Discover Civil Engineering, 2024
- Ahmed Mohammed Abdelalim, Yasmin Shalaby, Gamal A. Ebrahim, Mohamed Badawy, " Applying Fuzzy Decision-Making and Markov Chain Modelling for Detecting Life Cycle of RC Bridges ", , 2025
- Ahmed Mohammed Abdelalim, Yasmin Shalaby, Mohamed Salem, Manal Al-Adwani, GAMAL A. EBRAHIM, Mohamed Badawy, " Automated Vision-Based Crack Detection for Reinforced Concrete Bridges Using Matlab Algorithms ", , 2024
Research Projects
None