Overview
- Center Director: Prof. Dr. Ayman Lotfy Fayed
- Created: 27/11/2006
- Phone: (+2 02) 26855881 - 01144756715 - 01227372875
- Fax: (+2 02) 26855881
- E-mail: geotech_ainshams@yahoo.com
Unity objectives
- Prepare advisory reports for the soil.
- Do measurements to record the strains in the soil layers.
- Borings implementation and supervision.
- Monitor the implementation of the foundations of the installations.
Unit Achievements
Consulting and studies
- Geotechnical study and Geo-environmental, geophysical and seismic studies for 3,000 acres space - a project along the city May 15.
- Geotechnical and geophysical studies for the study of the safety and balance of Tabet El-Herafyin at El- Doweqa in Mansheyt Nasser and supervision of construction.
- National Project "Ebni Beitak," Sixth of October City, the unit has been done more than 5,000 soil research report for the beneficiaries of the project.
- Study Construction Safety project of Sukhna Heights village of Ain Sukhna on the tendencies and sand ramps.
- Project of poise and support the southern edge and the northern edge of the Mukattam plateau and supervise the work of the backfill.
- Project of repair and restore the lifting area of Ezbet El-Arab, Nasr City.
- Project of field inclination measurements of the complex of concrete walls tablet cultural trade mall at El Azhar Park as well as the inclination of the concrete walls of the tablet at the cultural entertainment centre at Port Saed.
- Project of field measurements using a pressure gauge to determine the location of the soil transactions of fourth line project for the Greater Cairo Metro and the factory of Ezz Steel ,Ain Sukhna.
- Geotechnical studies project in Damietta, Kafr Saad, Matrouh Air Base, Fayoum air base, and the main swimming pool of Marwa Village at north coast.
- Geotechnical studies project in new Heliopolis and Masaken Sheraton and the development of Merryland park for Heliopolis Housing Project and the ninth district of Heliopolis facilities and project of Nozhet El Obor which include 113 Building the fourth district in New Heliopolis and 49 villa at the First Quarter, and three projects on the territory of the group (35 F) in Heliopolis and three condominium at Nozhet El obor.
- Piles test experiments complementary to the Nile Velley Hospital at Hadayk El Kobba and an administrative building of the Ministry of Social Solidarity in Dokki.
- Confirm the quality control of substitution of the Saama Cairo Village, Lina spring Village, One Pace village ,El Forsan Village at 5th settlement, multilevel garage of Cairo Airport , radio and television building at El Mokattam, Capital Bussiness village at Sixth of October, the village of water caves ,El Qarya El Kawneya at Sixth of October , the village of Sama Zayed in Sheikh Zayed City,the village of Andalus El Shorouq at El Shorouq city, civilization are at El Azhar Park project, civilizational area project in Cairo, tertiary treatment station in new Cairo,water plant at industrial zone in 15 May, the Mubarak Housing at El Obour ,rehabilitation of Maadi water station,Cairo financial and tourism center at El Mukattam , project 37 Housing Building at tenth of Ramadan City and 11 Building on the land of Maadi club .
- Geotechnical studies and laboratory experiments to reduce the level of groundwater in El Obour.
- Geotechnical studies for the project of Housing National in Badr city of Cairo Governorate (19 Building of ASEC General Trading and Contracting company) and the construction of 56 in Badr city for Pioneers Engineering Construction Co. and the project of constructing 39 building of the national housing at 10th of Ramadan City and national housing project at El Salam district.
- Laboratory experiments for the Ain El Sokhna power plant project as well as the port of Port Said Company CHEC Chinese Alamein Airport.
- Field loading disk experiments to the new conference hall in Nasr City for Shanghai Construction SCG Co. and national housing project and the Capital Business project at Sixth of October City.
- Private consulting analyzing soil injection work down the project of Blood Transfusion National Center in Alexandria.
- Geotechnical studies for the project of the water line of the inlet to reservoir No. 3 Azhar Park , project of El Gomhoreya pharmaceutical company stores ,the project of constructing a building to the Faculty of Computing and Information Systems ,Ain Shams Uni. ,El Obour branch and El Obour Hospital project, complementary pile experiments to an administrative building at the Ministry of Social Solidarity (Introduction to Engineering Consulting Center University).
Other business
- Research projects and can be used in applied research which is carried out by graduate students.
- Projects that serve the environment, such as the development of slums of Tabet El Herafeyin project.
- Project support edges of the Mokattam project and environmental studies for the 3,000 acres along 15 May City